
Integrating Kanban with MRP II: Automating a Pull System for Enhanced JIT Inventory Management
by Louis, Raymond S.-
eCampus.com Device Compatibility Matrix
Click the device icon to install or view instructions
Rent Textbook
Rent Digital
New Textbook
We're Sorry
Sold Out
Used Textbook
We're Sorry
Sold Out
How Marketplace Works:
- This item is offered by an independent seller and not shipped from our warehouse
- Item details like edition and cover design may differ from our description; see seller's comments before ordering.
- Sellers much confirm and ship within two business days; otherwise, the order will be cancelled and refunded.
- Marketplace purchases cannot be returned to eCampus.com. Contact the seller directly for inquiries; if no response within two days, contact customer service.
- Additional shipping costs apply to Marketplace purchases. Review shipping costs at checkout.
Summary
Table of Contents
Publisher's Message | p. xiii |
Preface | p. xvii |
Acknowledgments | p. xxiii |
Eliminating Replenishment System Waste | p. 1 |
Replenishment System Review-Non-Value-Added Activities | p. 2 |
Push System Versus Pull System | p. 3 |
Manufacturing Resource Planning (MRPII) | p. 5 |
Order Point System | p. 9 |
Manual Kanban | p. 10 |
Automated Kanban System-Waste Elimination | p. 12 |
Replenishment System Basics | p. 15 |
MRPII Overview | p. 16 |
Master Production Schedule Module | p. 16 |
Material Requirements Planning Module | p. 17 |
Shop Scheduling Module | p. 19 |
Capacity Requirements Planning Module | p. 19 |
Order Point System Overview | p. 20 |
Manual Kanban System Overview | p. 21 |
Internal Move Card | p. 22 |
Production Card | p. 22 |
Supplier Card | p. 25 |
Broadcast | p. 25 |
Load-Smoothing and Sequencing | p. 25 |
Manual Kanban System-Kanban Calculation | p. 28 |
Production Card Calculation for Nonflexible Work Cells | p. 29 |
Determining Lead Time for a Nonflexible Work Cell | p. 30 |
Nonflexible Work-Cell Production-Card Calculation | p. 33 |
Flexible Work-Cell Production-Card Calculation | p. 34 |
Internal Move Card Calculation | p. 35 |
Supplier Card Calculation | p. 37 |
Automated Kanban-The Automated Flow Technology | p. 43 |
Automated Flow Technology | p. 44 |
Calculating Kanban Lot Sizes | p. 44 |
Creating Purchase Orders and Performing Download Upon Consumption | p. 45 |
Creating and Displaying Triggered Manufacturing Orders Upon Consumption | p. 49 |
Performing Receipts | p. 53 |
Calculating Flexible Work-Cell Staffing | p. 53 |
Automated Flow Technology Programming | p. 56 |
Kanban Calculation/Simulation Program (KCSP) | p. 56 |
KCSP Programming | p. 57 |
Cell-Staffing Calculation Programming (CSCP) | p. 59 |
MRPII Enhancements | p. 60 |
Lead-Time Definitions for the AFT System | p. 61 |
Supplier Lead Time | p. 61 |
Purchasing Replenishment Lead Time | p. 62 |
Manufacturing Lead Time | p. 63 |
Manufacturing Replenishment Lead Time | p. 63 |
Kanban Lot Size Versus Kanban Order Quantity | p. 64 |
Kanban Order Policy Code | p. 64 |
Supplier Download Capability | p. 65 |
Kanban Prerequisites-WCM Techniques | p. 67 |
Reduce Manufacturing and Supplier Replenishment Lead Times | p. 68 |
Reduce Batch Sizes | p. 71 |
Rectify Potential Obstacles That Can Impede Replenishment Performance | p. 71 |
Kanban Prerequisites | p. 72 |
World Class Manufacturing Conversion Plan | p. 73 |
Just-in-Time Education | p. 75 |
Total Productive Maintenance (TPM) Program | p. 77 |
Quick Changeover Program | p. 79 |
Zero Quality Control | p. 81 |
Visual Workplace | p. 83 |
Focused Factory/Work Cells | p. 84 |
Backflushing/Deduct Point Capability | p. 86 |
Stockroom Elimination | p. 88 |
Performance Measurement | p. 91 |
Container Selection | p. 91 |
Supplier Performance Rating and Supplier Contracts | p. 95 |
Data Integrity | p. 100 |
Prerequisites Completed | p. 101 |
Implementing Kanban | p. 103 |
OEM Internal Kanban Implementation | p. 103 |
Begin Implementing Kanban at Final Assembly | p. 104 |
Impact of Nonlinear Demand Patterns | p. 104 |
Selecting Specific Part Numbers for Kanban | p. 106 |
How to Handle Common Components | p. 108 |
Perform Cycle-Counting | p. 109 |
Applying Safety Stock | p. 109 |
Track the Inventory Levels | p. 110 |
OEM Kanban Procedures and Training | p. 111 |
Key Processes to Monitor During the OEM's Internal Implementation | p. 112 |
Implementing Kanban with Your Supplier Base | p. 112 |
Supplier Performance Ratings | p. 113 |
Suppliers That Should Not Be Placed on Kanban | p. 113 |
Selecting Specific Part Numbers for Kanban | p. 113 |
Supplier's Involvement in the Selection of Containers | p. 114 |
OEM as a Resource | p. 114 |
Key Processes to Monitor During the Supplier Implementation | p. 115 |
Speed of Overall Kanban Implementation | p. 115 |
Kanban and MRPII System Integration | p. 117 |
AFT Key Computer Fields and Their Functions | p. 117 |
Key Files Required by the AFT System | p. 134 |
Simplified Version of EDI | p. 136 |
Before Programming the AFT System | p. 137 |
AFT Calculations for Determining Kanban Lot Sizes and Staffing Levels | p. 139 |
Determining Kanban Lot Sizes with AFT | p. 140 |
Gross Requirements | p. 140 |
Kanban Lot-Size Formula | p. 141 |
Formula Modifier | p. 141 |
Kanban Lot-Size Calculation Steps | p. 142 |
KCSP Simulation Routine | p. 148 |
Formula Modifier Setting | p. 157 |
Determining Flexible Work-Cell Staffing Levels by Using CSCP | p. 159 |
Perpetuation of the Automated Kanban System | p. 161 |
Supplier One-Line-per-Item MRP Report | p. 162 |
Gross Requirements Report | p. 164 |
Net Requirements Report | p. 164 |
Planned Order Release Report | p. 167 |
Supplier Kanban Trigger Report | p. 167 |
Manufacturing Queue Screen | p. 170 |
Purchasing and Manufacturing Shortage Reports | p. 173 |
Flexible Work-Cell Staffing Reprt | p. 175 |
Add/Subtract Multiple Container Report | p. 176 |
Adjust Kanban Report for Single Container | p. 177 |
Trigger Kanban Report for Dual/Triple-Container Option | p. 177 |
Adjust Kanban Report for Dual/Triple-Container Option | p. 180 |
Purchasing Kanban Due Report | p. 180 |
Supplier Performance Rating Report | p. 182 |
Key Topics of the Automated Kanban System | p. 185 |
Managing the Transportation Cost | p. 185 |
Mistake-Proof the AFT Triggering Capability | p. 186 |
Non-Work-Cell Kanban Items | p. 187 |
Reacting to Customer Demand Versus Producing to a Frozen Schedule | p. 188 |
Standard Product Finished Goods/Allocation Methodology | p. 188 |
Nonlinear Customer Demand | p. 189 |
Imbalance of Inventory | p. 190 |
High Degree of Commonality | p. 190 |
Broadcast Application | p. 191 |
Short Receipt Policy | p. 192 |
Frequency of Kanban Recalculation | p. 193 |
Impact of Not Lot-Sizing MRP | p. 193 |
Automated Kanban System Design Process-General Guideline | p. 194 |
Three Examples of AFT Implementation | p. 199 |
North Star | p. 199 |
Precision Tape Backup | p. 205 |
Medical Monitoring | p. 209 |
Conclusion | p. 212 |
Index | p. 213 |
About the Author | p. 219 |
Table of Contents provided by Ingram. All Rights Reserved. |
An electronic version of this book is available through VitalSource.
This book is viewable on PC, Mac, iPhone, iPad, iPod Touch, and most smartphones.
By purchasing, you will be able to view this book online, as well as download it, for the chosen number of days.
Digital License
You are licensing a digital product for a set duration. Durations are set forth in the product description, with "Lifetime" typically meaning five (5) years of online access and permanent download to a supported device. All licenses are non-transferable.
More details can be found here.
A downloadable version of this book is available through the eCampus Reader or compatible Adobe readers.
Applications are available on iOS, Android, PC, Mac, and Windows Mobile platforms.
Please view the compatibility matrix prior to purchase.